580
Kowloon Canton Railway Survey. Mikist Bontory
Description of
*
Routers
Railway 4° 1 (Continued)
Cultivated district through tobich the line passes.
At Fan King, Station in the 19th Juice Rol makes junction with RZU. I takich runs powe theme to un Long
a branch live, some
A
8 Quiles in leught, to either R4U & 1 or RGNE Z whichever may ultimately be adopted.
the int
considuetta.
At Ro de provision has been made for a terminal station and repair shops in
sp
the live not bring constructed beyond the frontier. Should it proove atherine, under such circumstances, shopes of magnitude would be required, and it would them bu disincaber to locate them in Kowloon
Say
to the Eastroard of
the Cosmopolitan Book that about half loay
Acte the
failing
village of Ho than Tim and the sea, so that imported rolling stock and Quaterials could pass through the shops with the minimum amount of handling.
Railway H2
This conta commen
at
the same point-
as RYU?! already disoribed, and branches
A high Embankment. and maintained up to
westward At
peg 9700.
has to be adopted.
peg 13400 in order to provide headway for
braps for a proposed loopt road
11
at pay !! 500, and the existing poutier road at peg 13400.
From this to the 5th quile
the work is very light; but betwen the oth and ofthe queles two tunnels occur in granate
and trap rock, 750 and 287 Gards
10
17)
No comments yet.
Private notes are available after approval.